Tyumen Military Engineering Command High School Tyumen
Tyumen Military Engineering Command High School Tyumen
About Safe Route contest
TEAM (30 PERSONS)
Team leader Engineering unit: an officer (commander movement-support detachment), sappers (sergeants and soldiers) – 5 people TMM heavy mechanized bridge – 9 people (including one officer).
BAT Tracklayer – 2 people IMR engineering vehicle – 2 people Coaching group – 2 people Technical staff – 2 people Support staff – 3 people
STAGES
1. Ford reconnaissance by engineering reconnaissance patrol (section, сrew). 2. Anti-personnel mines clearance by etching method and minefields detection.
3. Assemblage of the mechanized bridge from the TMM set. 4. Recovery of the column way section by the BAT team. 5. Passage making by combat engineer vehicle (IMR).
EQUIPMENT
TMM-3 heavy mechanized bridge. BAT track layer. IMR-2 combat engineer vehicle. VSM mining system.