Head of team Pontoon company – 72 people Engineering squad – 5 человек Ferry-bridge vehicle - 1 ferryman, 2 crews 3-people-strong – 8 people
Amphibious carrier: platoon leader, 3 crews 2-people-strong – 6 people BAT Tracklayer – 2 people Coaching group – 2 people Support staff – 3 people Technical staff – 2 people
STAGES
1. Engineer reconnaissance of a water obstacle by engineer reconnaissance patrol on special inflatable boat. 2. Deploying the bridge over the anti-tank ditch and driving towards water obstacle by BAT trail-builder. 3. Mortar battery water-crossing by amphibious carriers. 4. Evacuation of injured man from the far bank by boat.
5. Equipping of 60 ton ferry and transporting of the ammunition vehicle to the far bank. 6. Equipping of two platoon ferries and transporting of tank platoon group to the far bank with the replacing of the interior bay in the second platoon ferry. 7. Equipping of a company ferry and transportation of heavy tracked vehicles to the far bank.
EQUIPMENT
PMP pontoon-bridge park. PTS amphibious medium APC. SNL special inflatable boat.
BAT track layer. Diving equipment. BMK towing motorboat.
Open Water contest photo gallery
Ministry of Defence of the Russian Federation 2019